County Roads by Maintenance Level

Enter a location, road name or zoom into your area of interest. Click on the road for more details or the camera for current road condition images.

Maintenance| Service

A staff of 19 creates the team to perform the maintenance and/or upgrades on county roads, bridges and rights of way.  Tasks of the Road & Bridge Department include snowplowing, removal of debris from roadway and rights of way, road repair, crack sealing, pot holes repair, chip sealing, installation of culverts and drainage systems, tree trimming and removal, and sign posting.

Road and Bridge currently maintains 236 miles of paved surface and 530 miles of gravel or native soil surfaces and 93 bridges.  This maintenance is spread over 3,733 square miles including High Valley and the areas of Warm Lake, Yellow Pine, Big Creek, Bear Valley, Deadwood, and Trails End.  Most Back Country Roads are closed through the winter and melt off in the spring.  Yellow Pine and Johnson Creek can be accessed year round using the South Fork Road.

Funding

A portion of funding for the Road & Bridge Department comes from the State of Idaho Highway User Fund – this fund source is generated from gas tax, vehicle registration and traffic violations.

*Currently no Property Taxes are used to fund the Road & Bridge Department.

If you have any questions please contact the Road & Bridge Department (208) 382-7195, P.O. Box 672 Cascade, Idaho  83611, roaddept@co.valley.id.us or visit our office at 520 South Front Street Cascade.

Superintendent

Jeff McFadden
jmcfadden@co.valley.id.us

P.O. Box 672
520 South Front Street
Cascade, Idaho 83611
Phone: (208) 382-7195
Fax: (208) 382-7198
roaddept@co.valley.id.us

Hours of Operation

Summer Hours
Monday – Thursday
7:00 am to 5:00 pm

Winter Hours
Monday - Friday
7:00 am to 3:30 pm